  "url": "affordablehomeremodeling.com/faq/how-long-does-it-take-to-build-an-adu",
  "name": "How long does it take to build an ADU?",
  "@type": "FAQPage",
  "@context": "https://schema.org",
  "speakable": {
    "@type": "SpeakableSpecification",
    "cssSelector": [
      "h1",
      ".faq-question",
      ".faq-answer",
      "[itemprop=\"acceptedAnswer\"]"
    ]
  },
  "mainEntity": [
    {
      "name": "How long does it take to build an ADU?",
      "@type": "Question",
      "acceptedAnswer": {
        "text": "The timeline for building an ADU can vary. The design and permitting phase often takes 3 to 6 months, depending on the complexity of the design and the responsiveness of local planning departments. Construction typically ranges from 4 to 9 months, influenced by the ADU's size, type, site conditions, and material availability. Overall, expect a total project duration of 7 to 15 months from start to finish.",
        "@type": "Answer",
        "description": "Building an ADU typically takes 7 to 15 months, with 3-6 months for design and permitting, and 4-9 months for construction."
      }
    }
  ],
  "description": "Building an ADU typically takes 7 to 15 months, with 3-6 months for design and permitting, and 4-9 months for construction."
}